Weev · EV charging site
Antrim & Newtownabbey Crematorium
582 Doagh Road, Newtownabbey, BT36 5QA
Antrim & Newtownabbey Crematorium is an EV charging site in Newtownabbey, Antrim and Newtownabbey, run by Weev. All 5 of its sockets are 22 kW Type 2. 5 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Corr's Corner Hotel (Weev), 0.7 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Weev
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Phone (from Open Charge Map)
- +44 29 9031 3031
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Antrim & Newtownabbey Crematorium (Weev)?
Up to 22 kW AC via Type 2.
How many charging sockets does Antrim & Newtownabbey Crematorium (Weev) have?
5 charging sockets: 5 × 22 kW Type 2.
Who operates Antrim & Newtownabbey Crematorium?
Antrim & Newtownabbey Crematorium is on the Weev network. For site issues, the operator lists +44 29 9031 3031.
Where is the nearest charger with 50 kW or more to Antrim & Newtownabbey Crematorium (Weev)?
Corr's Corner Hotel (Weev) is 0.7 miles away in a straight line, with up to 60 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Antrim & Newtownabbey Crematorium (Weev)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Antrim & Newtownabbey Crematorium (Weev)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Antrim & Newtownabbey Crematorium (Weev)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Ballyearl Golf Leisure Complex
- Mossley West Park and Ride
- Mossley Mill
- Corr's Corner Hotel
- DRD Car Park, Beverley Road
- Crown & Shamrock
- Fastest nearby
- Crown & Shamrock · 120 kW · 1.6 mi