Weev · EV charging site
Corr's Corner Hotel
315 Ballyclare Rd, Newtownabbey, BT36 4TQ
Corr's Corner Hotel is an EV charging site in Newtownabbey, Antrim and Newtownabbey, run by Weev. Its 4 sockets reach up to 60 kW, with CCS and CHAdeMO at the top speed. 6 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Crown & Shamrock (Weev), 1 mile away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Weev
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Phone (from Open Charge Map)
- +44 29 9031 3031
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Corr's Corner Hotel (Weev)?
Up to 60 kW DC via CCS, Type 2, CHAdeMO.
How many charging sockets does Corr's Corner Hotel (Weev) have?
4 charging sockets: 1 × 24 kW CCS, 2 × 7 kW Type 2, 1 × 60 kW CCS, 1 × 60 kW CHAdeMO.
Who operates Corr's Corner Hotel?
Corr's Corner Hotel is on the Weev network. For site issues, the operator lists +44 29 9031 3031.
Where is the nearest other charger with 50 kW or more to Corr's Corner Hotel (Weev)?
Crown & Shamrock (Weev) is 1 mile away in a straight line, with up to 120 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Corr's Corner Hotel (Weev)?
A typical 10–80% rapid charge takes about 58 min on the 60 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Corr's Corner Hotel (Weev)?
A typical 10–80% rapid charge takes about 43 min on the 60 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Corr's Corner Hotel (Weev)?
A typical 10–80% rapid charge takes about 57 min on the 60 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Antrim & Newtownabbey Crematorium
- Ballyearl Golf Leisure Complex
- Mossley West Park and Ride
- Mossley Mill
- DRD Car Park, Beverley Road
- Crown & Shamrock
- Fastest nearby
- Crown & Shamrock · 120 kW · 1 mi