Weev · EV charging site
City East Business Centre
68 - 72 Newtownards Road, Belfast, BT4 1GW
City East Business Centre is an EV charging site in Belfast, City of Belfast, run by Weev. Its 2 sockets reach up to 24 kW, with CCS at the top speed. 21 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Porsche (Porsche Smart Mobility GmbH), 0.4 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Weev
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Phone (from Open Charge Map)
- +44 29 9031 3031
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at City East Business Centre (Weev)?
Up to 24 kW DC via CCS, Type 2.
How many charging sockets does City East Business Centre (Weev) have?
2 charging sockets: 1 × 24 kW CCS, 1 × 7 kW Type 2.
Who operates City East Business Centre?
City East Business Centre is on the Weev network. For site issues, the operator lists +44 29 9031 3031.
Where is the nearest charger with 50 kW or more to City East Business Centre (Weev)?
Porsche (Porsche Smart Mobility GmbH) is 0.4 miles away in a straight line, with up to 320 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at City East Business Centre (Weev)?
A typical 10–80% rapid charge takes about 2h 26m on the 24 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at City East Business Centre (Weev)?
A typical 10–80% rapid charge takes about 1h 45m on the 24 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at City East Business Centre (Weev)?
A typical 10–80% rapid charge takes about 2h 14m on the 24 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Eastside Park and Ride
- Eastside Park & Ride
- Translink
- Public Record Office of Northern Ireland
- Premier Inn
- Odyssey Car Park
- Fastest nearby
- Translink · 142 kW · 0.2 mi