Weev · EV charging site
Public Record Office of Northern Ireland
Titanic Boulevard, Belfast, BT3 9HQ
Public Record Office of Northern Ireland is an EV charging site in Belfast, City of Belfast, run by Weev. Both of its sockets are 11 kW Type 2. 20 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Porsche (Porsche Smart Mobility GmbH), 0.3 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Weev
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Phone (from Open Charge Map)
- +44 29 9031 3031
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Public Record Office of Northern Ireland (Weev)?
Up to 11 kW AC via Type 2.
How many charging sockets does Public Record Office of Northern Ireland (Weev) have?
2 charging sockets: 2 × 11 kW Type 2.
Who operates Public Record Office of Northern Ireland?
Public Record Office of Northern Ireland is on the Weev network. For site issues, the operator lists +44 29 9031 3031.
Where is the nearest charger with 50 kW or more to Public Record Office of Northern Ireland (Weev)?
Porsche (Porsche Smart Mobility GmbH) is 0.3 miles away in a straight line, with up to 320 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Public Record Office of Northern Ireland (Weev)?
A 10–80% charge takes about 5h 2m on the 11 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Public Record Office of Northern Ireland (Weev)?
A 10–80% charge takes about 3h 38m on the 11 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Public Record Office of Northern Ireland (Weev)?
A 10–80% charge takes about 4h 39m on the 11 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Premier Inn
- Odyssey Car Park
- Aloft & Residence Inn
- City East Business Centre
- Eastside Park and Ride
- Titanic Visitors Centre
- Fastest nearby
- City East Business Centre · 24 kW · 0.3 mi