Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Weev · EV charging site

Eurospar Armagh

Dobbin Lane, Portadown, BT61 7AE

Eurospar Armagh is an EV charging site in Portadown, Armagh City Banbridge and Craigavon, run by Weev. All 4 of its sockets are 150 kW CCS. 9 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is McAnerney's Armagh (Weev), 0.3 miles away.

Status

No live status

We don't have live status for this charger. Check it when you arrive.

Community dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 4 May 2025Last verified 4 May 2025

Connectors

CCS · 150 kW4 connectors

Site information

Operator
Weev
Opening hours
Not published
Access
Public · membership required · access key required
Phone (from Open Charge Map)
+44 29 9031 3031

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 150 kW CCS~27 min
Tesla Model 3 Rear-Wheel Drive 10–80% · 150 kW CCS~24 min
Audi Q4 e-tron 50 10–80% · 150 kW CCS~39 min
Hyundai IONIQ 5 10–80% · 150 kW CCS~23 min
MG Motor MG4 Trophy 10–80% · 150 kW CCS~30 min
Hyundai Kona Electric Long Range 10–80% · 150 kW CCS~39 min

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How fast is charging at Eurospar Armagh (Weev)?

Up to 150 kW DC via CCS.

How many charging sockets does Eurospar Armagh (Weev) have?

4 charging sockets: 4 × 150 kW CCS.

Who operates Eurospar Armagh?

Eurospar Armagh is on the Weev network. For site issues, the operator lists +44 29 9031 3031.

Where is the nearest other charger with 50 kW or more to Eurospar Armagh (Weev)?

McAnerney's Armagh (Weev) is 0.3 miles away in a straight line, with up to 150 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Eurospar Armagh (Weev)?

A typical 10–80% rapid charge takes about 27 min on the 150 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Eurospar Armagh (Weev)?

A typical 10–80% rapid charge takes about 24 min on the 150 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Eurospar Armagh (Weev)?

A typical 10–80% rapid charge takes about 39 min on the 150 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 4 May 2025

Amp Map does not take payment. You pay the operator.