Weev · EV charging site
McAnerney's Armagh
22 Irish Street, Portadown, BT61 7EP
McAnerney's Armagh is an EV charging site in Portadown, Armagh City Banbridge and Craigavon, run by Weev. Both of its sockets are 150 kW CCS. 9 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Eurospar Armagh (Weev), 0.3 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Weev
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Phone (from Open Charge Map)
- +44 29 9031 3031
- Notes
- Power 150kW max shared between connectors. Bespoke app required.
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at McAnerney's Armagh (Weev)?
Up to 150 kW DC via CCS.
How many charging sockets does McAnerney's Armagh (Weev) have?
2 charging sockets: 2 × 150 kW CCS.
Who operates McAnerney's Armagh?
McAnerney's Armagh is on the Weev network. For site issues, the operator lists +44 29 9031 3031.
Where is the nearest other charger with 50 kW or more to McAnerney's Armagh (Weev)?
Eurospar Armagh (Weev) is 0.3 miles away in a straight line, with up to 150 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at McAnerney's Armagh (Weev)?
A typical 10–80% rapid charge takes about 27 min on the 150 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at McAnerney's Armagh (Weev)?
A typical 10–80% rapid charge takes about 24 min on the 150 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at McAnerney's Armagh (Weev)?
A typical 10–80% rapid charge takes about 39 min on the 150 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.