Weev · EV charging site
Lough Erne Resort
Lough Shore Road, Enniskillen, BT94 2LW
Lough Erne Resort is an EV charging site in Enniskillen, Fermanagh and Omagh, run by Weev. Its 4 sockets reach up to 60 kW, with CCS and CHAdeMO at the top speed. No other charging site is listed within a mile, and the nearest other site with 50 kW or more is Circle K Service Station (ESB Ecars), 2.3 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Weev
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Phone (from Open Charge Map)
- +44 29 9031 3031
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Lough Erne Resort (Weev)?
Up to 60 kW DC via Type 2, CCS, CHAdeMO.
How many charging sockets does Lough Erne Resort (Weev) have?
4 charging sockets: 3 × 22 kW Type 2, 1 × 60 kW CCS, 1 × 60 kW CHAdeMO.
Who operates Lough Erne Resort?
Lough Erne Resort is on the Weev network. For site issues, the operator lists +44 29 9031 3031.
Where is the nearest other charger with 50 kW or more to Lough Erne Resort (Weev)?
Circle K Service Station (ESB Ecars) is 2.3 miles away in a straight line, with up to 100 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Lough Erne Resort (Weev)?
A typical 10–80% rapid charge takes about 58 min on the 60 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Lough Erne Resort (Weev)?
A typical 10–80% rapid charge takes about 43 min on the 60 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Lough Erne Resort (Weev)?
A typical 10–80% rapid charge takes about 57 min on the 60 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Manor House Hotel
- Circle K Service Station
- College of Agriculture Food and Rural Enterprise (CAFRE)
- Ambulance Station Car Park
- Fastest nearby
- Circle K Service Station · 100 kW · 2.3 mi