ESB Ecars · EV charging site
Circle K Service Station
236 Irvinestown Road, Ballinamallard, BT94 2LA
Circle K Service Station is an EV charging site in Ballinamallard, Fermanagh and Omagh, run by ESB Ecars. All 4 of its sockets are 100 kW CCS. No other charging site is listed within a mile, and the nearest other site with 50 kW or more is Lough Erne Resort (Weev), 2.3 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- ESB Ecars
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Phone (from Open Charge Map)
- 1890 372 387
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Circle K Service Station (ESB Ecars)?
Up to 100 kW DC via CCS.
How many charging sockets does Circle K Service Station (ESB Ecars) have?
4 charging sockets: 4 × 100 kW CCS.
Who operates Circle K Service Station?
Circle K Service Station is on the ESB Ecars network. For site issues, the operator lists 1890 372 387.
Where is the nearest other charger with 50 kW or more to Circle K Service Station (ESB Ecars)?
Lough Erne Resort (Weev) is 2.3 miles away in a straight line, with up to 60 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Circle K Service Station (ESB Ecars)?
A typical 10–80% rapid charge takes about 36 min on the 100 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Circle K Service Station (ESB Ecars)?
A typical 10–80% rapid charge takes about 29 min on the 100 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Circle K Service Station (ESB Ecars)?
A typical 10–80% rapid charge takes about 43 min on the 100 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.