Weev · EV charging site
Enniskillen Business Centre
21 Lackaghboy Road, Enniskillen, BT74 4RL
Enniskillen Business Centre is an EV charging site in Enniskillen, Fermanagh and Omagh, run by Weev. Its 3 sockets reach up to 24 kW, with CCS at the top speed. No other charging site is listed within a mile, and the nearest site with 50 kW or more is Belmore Court & Motel (Weev), 1.5 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Weev
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Phone (from Open Charge Map)
- +44 29 9031 3031
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Enniskillen Business Centre (Weev)?
Up to 24 kW DC via CCS, Type 2.
How many charging sockets does Enniskillen Business Centre (Weev) have?
3 charging sockets: 1 × 24 kW CCS, 2 × 11 kW Type 2.
Who operates Enniskillen Business Centre?
Enniskillen Business Centre is on the Weev network. For site issues, the operator lists +44 29 9031 3031.
Where is the nearest charger with 50 kW or more to Enniskillen Business Centre (Weev)?
Belmore Court & Motel (Weev) is 1.5 miles away in a straight line, with up to 120 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Enniskillen Business Centre (Weev)?
A typical 10–80% rapid charge takes about 2h 26m on the 24 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Enniskillen Business Centre (Weev)?
A typical 10–80% rapid charge takes about 1h 45m on the 24 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Enniskillen Business Centre (Weev)?
A typical 10–80% rapid charge takes about 2h 14m on the 24 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Enniskilleen Hotel
- Belmore Court & Motel
- College of Agriculture Food and Rural Enterprise (CAFRE)
- Quay Lane North Car Park
- Ambulance Station Car Park
- Killyhevlin Business Centre
- Fastest nearby
- Belmore Court & Motel · 120 kW · 1.5 mi