Zero Carbon World · EV charging site
Albert Road
Albert Road, Great Malvern, WR13 6QS
Albert Road is an EV charging site in Great Malvern, Worcestershire, run by Zero Carbon World. It has a single 7 kW Type 2 socket, and the price is listed as Free for visitors to the centre only. No other charging site is listed within a mile, and the nearest site with 50 kW or more is MFG (GeniePoint), 4.1 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Zero Carbon World
- Opening hours
- Not published
- Access
- Public
- Price
- Free for visitors to the centre only(from Open Charge Map, 21 Mar 2023)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Albert Road (Zero Carbon World)?
The listed price is Free for visitors to the centre only. Prices can change, so check the price at the charger before you start.
How fast is charging at Albert Road (Zero Carbon World)?
Up to 7 kW AC via Type 2.
How many charging sockets does Albert Road (Zero Carbon World) have?
1 charging socket: 1 × 7 kW Type 2.
Who operates Albert Road?
Albert Road is on the Zero Carbon World network.
Where is the nearest charger with 50 kW or more to Albert Road (Zero Carbon World)?
MFG (GeniePoint) is 4.1 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Albert Road (Zero Carbon World)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Albert Road (Zero Carbon World)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Albert Road (Zero Carbon World)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- LHS of car park
- The Council House Carpark, Avenue Road, Malvern WR143AF
- Geraldine Road
- Victoria Road Car Park
- Newtown Road Car Park
- Pod Point Tesco Superstore - Ledbury
- Cheapest nearby
- Pod Point Tesco Superstore - Ledbury · 44.4p per kWh · 7 kW · 3.9 mi