Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Zero Carbon World · EV charging site

Bow Street Car Park

Bow Street, Bridgwater, TA10 9PR

Bow Street Car Park is an EV charging site in Bridgwater, Somerset, run by Zero Carbon World. It has a single 7 kW Type 2 socket. 1 other charging site is listed within a mile, and the nearest site with 50 kW or more is Cartgate Lodge (POGO), 6 miles away.

Status

No live status

We don't have live status for this charger. Check it when you arrive.

Community dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 14 Nov 2016Last verified 14 Nov 2016

Connectors

Type 2 · 7 kW1 connector

Site information

Opening hours
Not published
Access
Public
Notes
Located in main Carpark - short stay beyond presinct near Cocklemoor & river Parrett. Free to use for people visiting the town. Donations to cover costs welcome.

Facilities

Car park

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 7 kW Type 2~7h 54m
Tesla Model 3 Rear-Wheel Drive 10–80% · 7 kW Type 2~5h 42m
Audi Q4 e-tron 50 10–80% · 7 kW Type 2~7h 18m
Hyundai IONIQ 5 10–80% · 7 kW Type 2~7h 16m
MG Motor MG4 Trophy 10–80% · 7 kW Type 2~6h 6m
Hyundai Kona Electric Long Range 10–80% · 7 kW Type 2~5h 48m
Nissan LEAF 10–80% · 7 kW Type 2~4h 15m

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How fast is charging at Bow Street Car Park (Zero Carbon World)?

Up to 7 kW AC via Type 2.

How many charging sockets does Bow Street Car Park (Zero Carbon World) have?

1 charging socket: 1 × 7 kW Type 2.

Who operates Bow Street Car Park?

Bow Street Car Park is on the Zero Carbon World network.

Where is the nearest charger with 50 kW or more to Bow Street Car Park (Zero Carbon World)?

Cartgate Lodge (POGO) is 6 miles away in a straight line, with up to 80 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Bow Street Car Park (Zero Carbon World)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Bow Street Car Park (Zero Carbon World)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Bow Street Car Park (Zero Carbon World)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 14 Nov 2016

Amp Map does not take payment. You pay the operator.