Zero Carbon World · EV charging site
Hafod Y Llan Farm, National Trust Campsite
Nantgwynant, Blaenau-Ffestiniog, LL55 4NQ
Hafod Y Llan Farm, National Trust Campsite is an EV charging site in Blaenau-Ffestiniog, Gwynedd, run by Zero Carbon World. Its 2 sockets reach up to 7 kW, with Type 2 at the top speed. No other charging site is listed within a mile, and the nearest site with 50 kW or more is Diffwys CP Blaenau Ffestiniog (Evolt), 5.7 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Zero Carbon World
- Opening hours
- Not published
- Access
- Public
- Phone (from Open Charge Map)
- 0176 6890473
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Hafod Y Llan Farm, National Trust Campsite (Zero Carbon World)?
Up to 7 kW AC via BS1363 3 Pin 13 Amp, Type 2.
How many charging sockets does Hafod Y Llan Farm, National Trust Campsite (Zero Carbon World) have?
2 charging sockets: 1 × 3 kW BS1363 3 Pin 13 Amp, 1 × 7 kW Type 2.
Who operates Hafod Y Llan Farm, National Trust Campsite?
Hafod Y Llan Farm, National Trust Campsite is on the Zero Carbon World network. For site issues, the operator lists 0176 6890473.
Where is the nearest charger with 50 kW or more to Hafod Y Llan Farm, National Trust Campsite (Zero Carbon World)?
Diffwys CP Blaenau Ffestiniog (Evolt) is 5.7 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Hafod Y Llan Farm, National Trust Campsite (Zero Carbon World)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Hafod Y Llan Farm, National Trust Campsite (Zero Carbon World)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Hafod Y Llan Farm, National Trust Campsite (Zero Carbon World)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Cheapest nearby
- Pod Point Beddgelert Campsite · 55.2p per kWh · 7 kW · 3.3 mi