Zero Carbon World · EV charging site
National Trust Canolfan Deilan Las
Craflwyn Hall, Penrhyndeudraeth, LL55 4NG
National Trust Canolfan Deilan Las is an EV charging site in Penrhyndeudraeth, Gwynedd, run by Zero Carbon World. It has a single 7 kW Type 2 socket. No other charging site is listed within a mile, and the nearest site with 50 kW or more is Lard-yr-Orsaf Pay & Display Car Park (Evolt), 6.3 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Zero Carbon World
- Opening hours
- Not published
- Access
- Public
- Phone (from Open Charge Map)
- 01766 510120
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at National Trust Canolfan Deilan Las (Zero Carbon World)?
Up to 7 kW AC via Type 2.
How many charging sockets does National Trust Canolfan Deilan Las (Zero Carbon World) have?
1 charging socket: 1 × 7 kW Type 2.
Who operates National Trust Canolfan Deilan Las?
National Trust Canolfan Deilan Las is on the Zero Carbon World network. For site issues, the operator lists 01766 510120.
Where is the nearest charger with 50 kW or more to National Trust Canolfan Deilan Las (Zero Carbon World)?
Lard-yr-Orsaf Pay & Display Car Park (Evolt) is 6.3 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at National Trust Canolfan Deilan Las (Zero Carbon World)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at National Trust Canolfan Deilan Las (Zero Carbon World)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at National Trust Canolfan Deilan Las (Zero Carbon World)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Cheapest nearby
- Pod Point Beddgelert Campsite · 55.2p per kWh · 7 kW · 1.2 mi