Zero Carbon World · EV charging site
Knepp Wildland Safaris and Camping
New Barn Farm, Horsham, RH13 8NN
Knepp Wildland Safaris and Camping is an EV charging site in Horsham, West Sussex, run by Zero Carbon World. Both of its sockets are 7 kW Type 2. 1 other charging site is listed within a mile, and the nearest site with 50 kW or more is Ashington SF Connect (BP Pulse), 2.5 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Zero Carbon World
- Opening hours
- Not published
- Access
- Customers only
- Phone (from Open Charge Map)
- 01403 713230
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Knepp Wildland Safaris and Camping (Zero Carbon World)?
Up to 7 kW AC via Type 2.
How many charging sockets does Knepp Wildland Safaris and Camping (Zero Carbon World) have?
2 charging sockets: 1 × 7 kW Type 2, 1 × 7 kW Type 2.
Who operates Knepp Wildland Safaris and Camping?
Knepp Wildland Safaris and Camping is on the Zero Carbon World network. For site issues, the operator lists 01403 713230.
Can anyone charge at Knepp Wildland Safaris and Camping (Zero Carbon World)?
The operator lists this charger for customers of the site.
Where is the nearest charger with 50 kW or more to Knepp Wildland Safaris and Camping (Zero Carbon World)?
Ashington SF Connect (BP Pulse) is 2.5 miles away in a straight line, with up to 150 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Knepp Wildland Safaris and Camping (Zero Carbon World)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Knepp Wildland Safaris and Camping (Zero Carbon World)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Knepp Wildland Safaris and Camping (Zero Carbon World)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Cheapest nearby
- Pod Point Knepp Wilding Kitchen & Shop · 64.8p per kWh · 7 kW · 0.3 mi
- Fastest nearby
- Ashington SF Connect · 150 kW · 2.5 mi