Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

BP Pulse · EV charging site

Ashington SF Connect

London Road, Lancing, RH20 3AT

Ashington SF Connect is an EV charging site in Lancing, West Sussex, run by BP Pulse and open 24 hours a day. Its 4 sockets reach up to 150 kW, with CCS at the top speed. Recorded live status shows it is usually busiest around 4 pm, and Amp Map measured 99% uptime and recorded 435 charging sessions here over the last 30 days. No other charging site is listed within a mile, and the nearest other site with 50 kW or more is BP Upper Beeding (GeniePoint), 5.4 miles away.

Status

4 of 4 available

Checking status…

VerifiedLive status and details from BP Pulse’s data feed. Amp Map updates them automatically.Last synced 22 Nov 2026

Connectors

CCS · 150 kW2 connectors2 free
BPU005399% reliabilityAvailable
BPU005499% reliabilityAvailable
CHAdeMO · 100 kW2 connectors2 free
BPU005399% reliabilityAvailable
BPU005499% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
BP Pulse
Opening hours
Open 24 hours
Payment
Bank card at the chargerIn the BP Pulse appRFID card
Charger ID
BPU0053

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 150 kW CCS~27 min
Tesla Model 3 Rear-Wheel Drive 10–80% · 150 kW CCS~24 min
Audi Q4 e-tron 50 10–80% · 150 kW CCS~39 min
Hyundai IONIQ 5 10–80% · 150 kW CCS~23 min
MG Motor MG4 Trophy 10–80% · 150 kW CCS~30 min
Hyundai Kona Electric Long Range 10–80% · 150 kW CCS~39 min
Nissan LEAF 10–80% · 100 kW CHAdeMO~54 min

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How fast is charging at Ashington SF Connect (BP Pulse)?

Up to 150 kW DC via CHAdeMO, CCS.

How many charging sockets does Ashington SF Connect (BP Pulse) have?

4 charging sockets: 2 × 100 kW CHAdeMO, 2 × 150 kW CCS. Live per-socket availability is shown on this page.

Is Ashington SF Connect (BP Pulse) open 24/7?

Yes - Ashington SF Connect (BP Pulse) is open 24 hours a day, 7 days a week.

When is Ashington SF Connect (BP Pulse) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 4 pm and quietest around 10 pm. The live status on this page shows what is free before you set off.

How reliable is Ashington SF Connect (BP Pulse)?

Amp Map measured 99% uptime here from recorded live status over the last 30 days, across 435 observed charging sessions.

Who operates Ashington SF Connect?

Ashington SF Connect is on the BP Pulse network.

Where is the nearest other charger with 50 kW or more to Ashington SF Connect (BP Pulse)?

BP Upper Beeding (GeniePoint) is 5.4 miles away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Ashington SF Connect (BP Pulse)?

A typical 10–80% rapid charge takes about 27 min on the 150 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Ashington SF Connect (BP Pulse)?

A typical 10–80% rapid charge takes about 24 min on the 150 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Ashington SF Connect (BP Pulse)?

A typical 10–80% rapid charge takes about 39 min on the 150 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: BP Pulse · synced 22 Nov 2026

Amp Map does not take payment. You pay the operator.