Zero Carbon World · EV charging site
Manor House Hotel and Golf Club
Castle Combe, Chippenham, SN14 7HR
Manor House Hotel and Golf Club is an EV charging site in Chippenham, Wiltshire, run by Zero Carbon World. Its 2 sockets reach up to 7 kW, with Type 2 at the top speed. 2 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Hartham Park, 3.4 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Zero Carbon World
- Opening hours
- Not published
- Access
- Public
- Phone (from Open Charge Map)
- 01249 78220
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Manor House Hotel and Golf Club (Zero Carbon World)?
Up to 7 kW AC via Type 2, BS1363 3 Pin 13 Amp.
How many charging sockets does Manor House Hotel and Golf Club (Zero Carbon World) have?
2 charging sockets: 1 × 7 kW Type 2, 1 × 3 kW BS1363 3 Pin 13 Amp.
Who operates Manor House Hotel and Golf Club?
Manor House Hotel and Golf Club is on the Zero Carbon World network. For site issues, the operator lists 01249 78220.
Where is the nearest charger with 50 kW or more to Manor House Hotel and Golf Club (Zero Carbon World)?
Hartham Park is 3.4 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Manor House Hotel and Golf Club (Zero Carbon World)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Manor House Hotel and Golf Club (Zero Carbon World)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Manor House Hotel and Golf Club (Zero Carbon World)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Rawowned Manor House 2
- Rawowned Manor Golf 1
- EH - MOTO Leigh Delamere Eastbound
- Hartham Park
- Leigh Delamere, UK - Westbound
- EH - MOTO Leigh Delamere Westbound
- Cheapest nearby
- Leigh Delamere, UK - Westbound · 26p per kWh · 250 kW · 3.5 mi
- Fastest nearby
- EH - MOTO Leigh Delamere Westbound · 400 kW · 3.5 mi