Zero Carbon World · EV charging site
The Olde House
Chapel Amble, Bodmin, PL27 6EN
The Olde House is an EV charging site in Bodmin, Cornwall, run by Zero Carbon World. Its 2 sockets reach up to 7 kW, with Type 2 at the top speed. No other charging site is listed within a mile, and the nearest site with 50 kW or more is Pearl and Trawl, Wadebridge (Osprey Charging), 2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Zero Carbon World
- Opening hours
- Not published
- Access
- Public
- Phone (from Open Charge Map)
- 01208 813219
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at The Olde House (Zero Carbon World)?
Up to 7 kW AC via Type 2, BS1363 3 Pin 13 Amp.
How many charging sockets does The Olde House (Zero Carbon World) have?
2 charging sockets: 1 × 7 kW Type 2, 1 × 3 kW BS1363 3 Pin 13 Amp.
Who operates The Olde House?
The Olde House is on the Zero Carbon World network. For site issues, the operator lists 01208 813219.
Where is the nearest charger with 50 kW or more to The Olde House (Zero Carbon World)?
Pearl and Trawl, Wadebridge (Osprey Charging) is 2 miles away in a straight line, with up to 75 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at The Olde House (Zero Carbon World)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at The Olde House (Zero Carbon World)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at The Olde House (Zero Carbon World)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Wadebridge, Higher Trenant Office - Cornwall
- St Kew Holiday Cottages
- St Kew Pottery
- Pearl and Trawl, Wadebridge
- Pod Point Tesco Superstore - Wadebridge
- Wadebridge SF Connect
- Cheapest nearby
- Pod Point Tesco Superstore - Wadebridge · 44.4p per kWh · 7 kW · 2.2 mi
- Fastest nearby
- Wadebridge SF Connect · 150 kW · 2.3 mi