GeniePoint · EV charging site
Wadebridge, Higher Trenant Office - Cornwall
Gonvena Hill, Bodmin, PL27 6TW
Wadebridge, Higher Trenant Office - Cornwall is an EV charging site in Bodmin, Cornwall, run by GeniePoint. All 6 of its sockets are 22 kW Type 2, and the price is listed as £0.50 + £0.30/kWh. No other charging site is listed within a mile, and the nearest site with 50 kW or more is Blue Diamond Trelawney (Be.EV), 1 mile away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- GeniePoint
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.50 + £0.30/kWh(from Open Charge Map, 6 Sept 2019)
- Phone (from Open Charge Map)
- +44 800 999 4240
- Getting there
- Reserved for Cornwall Council / CORMAC pool cars
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Wadebridge, Higher Trenant Office - Cornwall (GeniePoint)?
The listed price is £0.50 + £0.30/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Wadebridge, Higher Trenant Office - Cornwall (GeniePoint)?
Up to 22 kW AC via Type 2.
How many charging sockets does Wadebridge, Higher Trenant Office - Cornwall (GeniePoint) have?
6 charging sockets: 6 × 22 kW Type 2.
Who operates Wadebridge, Higher Trenant Office - Cornwall?
Wadebridge, Higher Trenant Office - Cornwall is on the GeniePoint network. For site issues, the operator lists +44 800 999 4240.
Where is the nearest charger with 50 kW or more to Wadebridge, Higher Trenant Office - Cornwall (GeniePoint)?
Blue Diamond Trelawney (Be.EV) is 1 mile away in a straight line, with up to 80 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Wadebridge, Higher Trenant Office - Cornwall (GeniePoint)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Wadebridge, Higher Trenant Office - Cornwall (GeniePoint)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Wadebridge, Higher Trenant Office - Cornwall (GeniePoint)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Blue Diamond Trelawney
- Pearl and Trawl, Wadebridge
- The Olde House
- Pod Point Tesco Superstore - Wadebridge
- Wadebridge SF Connect
- Evology Charging - Hustyns Hotel & Spa
- Cheapest nearby
- Pod Point Tesco Superstore - Wadebridge · 44.4p per kWh · 7 kW · 1.5 mi
- Fastest nearby
- Wadebridge SF Connect · 150 kW · 1.6 mi