Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Be.EV · EV charging site

Blue Diamond Trelawney

Trelawney Garden Centre, Bodmin, PL27 6JA

Blue Diamond Trelawney is an EV charging site in Bodmin, Cornwall, run by Be.EV. Its 6 sockets reach up to 80 kW, with CCS at the top speed, and published prices run from £0.59 to £0.89 per kWh. Recorded live status shows it is usually busiest around noon, and Amp Map measured 100% uptime and recorded 123 charging sessions here over the last 30 days. No other charging site is listed within a mile, and the nearest other site with 50 kW or more is Pearl and Trawl, Wadebridge (Osprey Charging), 2 miles away.

Status

6 of 6 available

Checking status…

VerifiedLive status and details from Be.EV’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

CCS · 80 kW3 connectors · 89p per kWh3 free
KM0028-01100% reliabilityAvailable
KM0028-02100% reliabilityAvailable
KM0028-04100% reliabilityAvailable
CHAdeMO · 50 kW1 connector · 84p per kWh1 free
KM0028-03100% reliabilityAvailable
Type 2 · 22 kW2 connectors · 59p per kWh2 free
AD00652-1100% reliabilityAvailable
AD00652-2100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
Be.EV
Opening hours
Mon–Sat 08:30–17:30Sun 10:00–16:00No charging outside opening hours
Parking
Car park
Payment
In the Be.EV app
Charger ID
AD00652-1

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
CCS80 kW89p per kWh
CHAdeMO50 kW84p per kWh
Type 222 kW59p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 80 kW CCS~44 min · ≈ 55 kWh · ~£49
Tesla Model 3 Rear-Wheel Drive 10–80% · 80 kW CCS~33 min · ≈ 40 kWh · ~£36
Audi Q4 e-tron 50 10–80% · 80 kW CCS~47 min · ≈ 51 kWh · ~£45
Hyundai IONIQ 5 10–80% · 80 kW CCS~40 min · ≈ 51 kWh · ~£45
MG Motor MG4 Trophy 10–80% · 80 kW CCS~38 min · ≈ 43 kWh · ~£38
Hyundai Kona Electric Long Range 10–80% · 80 kW CCS~42 min · ≈ 41 kWh · ~£36
Nissan LEAF 10–80% · 50 kW CHAdeMO~55 min · ≈ 28 kWh · ~£24

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Blue Diamond Trelawney (Be.EV)?

The listed price is CHAdeMO £0.84/kWh · CCS £0.89/kWh · Type 2 £0.59/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Blue Diamond Trelawney (Be.EV)?

Up to 80 kW DC via CHAdeMO, CCS, Type 2.

How many charging sockets does Blue Diamond Trelawney (Be.EV) have?

6 charging sockets: 1 × 50 kW CHAdeMO, 3 × 80 kW CCS, 2 × 22 kW Type 2. Live per-socket availability is shown on this page.

When is Blue Diamond Trelawney (Be.EV) open?

Opening hours: Mon–Sat 08:30–17:30; Sun 10:00–16:00.

When is Blue Diamond Trelawney (Be.EV) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around noon and quietest around 10 pm. The live status on this page shows what is free before you set off.

How reliable is Blue Diamond Trelawney (Be.EV)?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 123 observed charging sessions.

Who operates Blue Diamond Trelawney?

Blue Diamond Trelawney is on the Be.EV network.

Where is the nearest other charger with 50 kW or more to Blue Diamond Trelawney (Be.EV)?

Pearl and Trawl, Wadebridge (Osprey Charging) is 2 miles away in a straight line, with up to 75 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Blue Diamond Trelawney (Be.EV)?

A typical 10–80% rapid charge takes about 44 min on the 80 kW CCS here, adding roughly 55 kWh (~£49 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Blue Diamond Trelawney (Be.EV)?

A typical 10–80% rapid charge takes about 33 min on the 80 kW CCS here, adding roughly 40 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Blue Diamond Trelawney (Be.EV)?

A typical 10–80% rapid charge takes about 47 min on the 80 kW CCS here, adding roughly 51 kWh (~£45 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: Be.EV · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.