EV charging site
48 Barton Road
Barton Road, Slough, SL3 8DF
48 Barton Road is an EV charging site in Slough. Its 2 sockets reach up to 7 kW, with Type 2 and J-1772 at the top speed, and the price is listed as £1.00/hour+£0.50/kWh. 4 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Red Lion (Langley) (evyve), 0.3 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Price
- £1.00/hour+£0.50/kWh(from Open Charge Map, 3 Jul 2023)
- Phone (from Open Charge Map)
- 07958210810
- Notes
- Short walk to GWR Railway station.
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at 48 Barton Road?
The listed price is £1.00/hour+£0.50/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at 48 Barton Road?
Up to 7 kW AC via Type 2, J-1772, Blue Commando (2P+E).
How many charging sockets does 48 Barton Road have?
2 charging sockets: 1 × 7 kW Type 2, 1 × 7 kW J-1772, 1 × 3 kW Blue Commando (2P+E).
Where is the nearest charger with 50 kW or more to 48 Barton Road?
Red Lion (Langley) (evyve) is 0.3 miles away in a straight line, with up to 75 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at 48 Barton Road?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at 48 Barton Road?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at 48 Barton Road?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Red Lion (Langley)
- Langley Leisure Centre
- The Centre Car Park
- Heathrow/Windsor Marriott Hotel
- Red Lion (Iver)
- Iver Recreation Ground Car Park
- Cheapest nearby
- Iver Recreation Ground Car Park · 65p per kWh · 7 kW · 1.8 mi
- Fastest nearby
- Red Lion (Langley) · 75 kW · 0.3 mi