Total Energies · EV charging site
Langley Leisure Centre
Parlaunt Road, Slough, SL3 8BD
Langley Leisure Centre is an EV charging site in Slough, run by Total Energies. Its 6 sockets reach up to 7 kW, with Type 2 at the top speed, and charging is listed as free. 4 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Red Lion (Langley) (evyve), 0.9 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- Free(from Open Charge Map, 30 Jul 2018)
- Notes
- Chargemaster post 684. Source London and Polar Network cards accepted
- Getting there
- Left at the entrance to car park
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Langley Leisure Centre (Total Energies)?
The listed price is Free. Prices can change, so check the price at the charger before you start.
How fast is charging at Langley Leisure Centre (Total Energies)?
Up to 7 kW AC via Type 2, BS1363 3 Pin 13 Amp.
How many charging sockets does Langley Leisure Centre (Total Energies) have?
6 charging sockets: 6 × 7 kW Type 2, 1 × 3 kW BS1363 3 Pin 13 Amp.
Who operates Langley Leisure Centre?
Langley Leisure Centre is on the Total Energies network.
Where is the nearest charger with 50 kW or more to Langley Leisure Centre (Total Energies)?
Red Lion (Langley) (evyve) is 0.9 miles away in a straight line, with up to 75 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Langley Leisure Centre (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Langley Leisure Centre (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Langley Leisure Centre (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- The Centre Car Park
- Heathrow/Windsor Marriott Hotel
- 48 Barton Road
- Red Lion (Langley)
- Red Lion (Iver)
- Iver Recreation Ground Car Park
- Cheapest nearby
- Iver Recreation Ground Car Park · 65p per kWh · 7 kW · 1.8 mi
- Fastest nearby
- Red Lion (Langley) · 75 kW · 0.9 mi