Total Energies · EV charging site
The Centre Car Park
Farnham Road, Slough, SL1 4UT
The Centre Car Park is an EV charging site in Slough, run by Total Energies. It has a single socket, with Type 2 at up to 7 kW. 4 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Red Lion (Langley) (evyve), 0.9 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- Free. Parking fees apply.(from Open Charge Map, 9 Feb 2017)
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at The Centre Car Park (Total Energies)?
The listed price is Free. Parking fees apply.. Prices can change, so check the price at the charger before you start.
How fast is charging at The Centre Car Park (Total Energies)?
Up to 7 kW AC via Type 2, BS1363 3 Pin 13 Amp.
How many charging sockets does The Centre Car Park (Total Energies) have?
1 charging socket: 1 × 7 kW Type 2, 1 × 3 kW BS1363 3 Pin 13 Amp.
Who operates The Centre Car Park?
The Centre Car Park is on the Total Energies network.
Where is the nearest charger with 50 kW or more to The Centre Car Park (Total Energies)?
Red Lion (Langley) (evyve) is 0.9 miles away in a straight line, with up to 75 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at The Centre Car Park (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at The Centre Car Park (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at The Centre Car Park (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Langley Leisure Centre
- 48 Barton Road
- Heathrow/Windsor Marriott Hotel
- Red Lion (Langley)
- Red Lion (Iver)
- Iver Recreation Ground Car Park
- Cheapest nearby
- Iver Recreation Ground Car Park · 65p per kWh · 7 kW · 1.7 mi
- Fastest nearby
- Red Lion (Langley) · 75 kW · 0.9 mi