Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Alfapower · EV charging site

Abaseen Superstore

171 Harehills Lane, Chapel Allerton, LS8 3QE

Abaseen Superstore is an EV charging site in Chapel Allerton, City and Borough of Leeds, run by Alfapower. It has a single 22 kW Type 2 socket, and the price is listed as Alfa Power: 25p/kWh. 5 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Morrisons Leeds Harehills (GeniePoint), 0.3 miles away.

Status

No live status

We don't have live status for this charger. Check it when you arrive.

Community dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 7 Jan 2021Last verified 7 Jan 2021

Connectors

Type 2 · 22 kW1 connector

Site information

Operator
Alfapower
Opening hours
Not published
Access
Public
Payment
Pay at the charger (from Open Charge Map)
Price
Alfa Power: 25p/kWh(from Open Charge Map, 7 Jan 2021)
Notes
Alfa Power 22kw AC post. Contactless, App or RFID. www.alfapower.co.uk/app
Getting there
Store open 09:00-20:00. Charger accessible 24/7.

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 22 kW Type 2~5h 2m
Tesla Model 3 Rear-Wheel Drive 10–80% · 22 kW Type 2~3h 38m
Audi Q4 e-tron 50 10–80% · 22 kW Type 2~4h 39m
Hyundai IONIQ 5 10–80% · 22 kW Type 2~4h 37m
MG Motor MG4 Trophy 10–80% · 22 kW Type 2~3h 53m
Hyundai Kona Electric Long Range 10–80% · 22 kW Type 2~5h 38m
Nissan LEAF 10–80% · 22 kW Type 2~4h 15m

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Abaseen Superstore (Alfapower)?

The listed price is Alfa Power: 25p/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Abaseen Superstore (Alfapower)?

Up to 22 kW AC via Type 2.

How many charging sockets does Abaseen Superstore (Alfapower) have?

1 charging socket: 1 × 22 kW Type 2.

Who operates Abaseen Superstore?

Abaseen Superstore is on the Alfapower network.

Where is the nearest charger with 50 kW or more to Abaseen Superstore (Alfapower)?

Morrisons Leeds Harehills (GeniePoint) is 0.3 miles away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Abaseen Superstore (Alfapower)?

A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Abaseen Superstore (Alfapower)?

A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Abaseen Superstore (Alfapower)?

A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 7 Jan 2021

Amp Map does not take payment. You pay the operator.