Alfapower · EV charging site
Abaseen Superstore
171 Harehills Lane, Chapel Allerton, LS8 3QE
Abaseen Superstore is an EV charging site in Chapel Allerton, City and Borough of Leeds, run by Alfapower. It has a single 22 kW Type 2 socket, and the price is listed as Alfa Power: 25p/kWh. 5 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Morrisons Leeds Harehills (GeniePoint), 0.3 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Alfapower
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Price
- Alfa Power: 25p/kWh(from Open Charge Map, 7 Jan 2021)
- Notes
- Alfa Power 22kw AC post. Contactless, App or RFID. www.alfapower.co.uk/app
- Getting there
- Store open 09:00-20:00. Charger accessible 24/7.
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Abaseen Superstore (Alfapower)?
The listed price is Alfa Power: 25p/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Abaseen Superstore (Alfapower)?
Up to 22 kW AC via Type 2.
How many charging sockets does Abaseen Superstore (Alfapower) have?
1 charging socket: 1 × 22 kW Type 2.
Who operates Abaseen Superstore?
Abaseen Superstore is on the Alfapower network.
Where is the nearest charger with 50 kW or more to Abaseen Superstore (Alfapower)?
Morrisons Leeds Harehills (GeniePoint) is 0.3 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Abaseen Superstore (Alfapower)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Abaseen Superstore (Alfapower)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Abaseen Superstore (Alfapower)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Morrisons Leeds Harehills
- Pod Point Tesco Superstore - Leeds
- Asda Harehills Lane
- Roundhay Park Clocktower carpark
- Nowell Filling Station
- Bristol Street
- Cheapest nearby
- Pod Point Tesco Superstore - Leeds · 44.4p per kWh · 50 kW · 0.5 mi
- Fastest nearby
- Bristol Street · 100 kW · 1.1 mi