InstaVolt Ltd · EV charging site
Nowell Filling Station
Harehills Lane, Leeds, LS9 6LQ
Nowell Filling Station is an EV charging site in Leeds, City and Borough of Leeds, run by InstaVolt Ltd. It has a single socket, with CCS and CHAdeMO at up to 50 kW, and the price is listed as £0.75/kWh. 5 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Asda Harehills Lane (GeniePoint), 160 yards away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- InstaVolt Ltd
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Price
- £0.75/kWh(from Open Charge Map, 3 Mar 2023)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Nowell Filling Station (InstaVolt Ltd)?
The listed price is £0.75/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Nowell Filling Station (InstaVolt Ltd)?
Up to 50 kW DC via CCS, CHAdeMO.
How many charging sockets does Nowell Filling Station (InstaVolt Ltd) have?
1 charging socket: 1 × 50 kW CCS, 1 × 50 kW CHAdeMO.
Who operates Nowell Filling Station?
Nowell Filling Station is on the InstaVolt Ltd network.
Where is the nearest other charger with 50 kW or more to Nowell Filling Station (InstaVolt Ltd)?
Asda Harehills Lane (GeniePoint) is 160 yards away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Nowell Filling Station (InstaVolt Ltd)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Nowell Filling Station (InstaVolt Ltd)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Nowell Filling Station (InstaVolt Ltd)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Asda Harehills Lane
- The Old Fire Station Community Centre
- Pod Point Trinity Academy Leeds
- Morrisons Leeds Harehills
- Abaseen Superstore
- Bristol Street
- Cheapest nearby
- Pod Point Trinity Academy Leeds · 39.6p per kWh · 22 kW · 0.5 mi
- Fastest nearby
- Bristol Street · 100 kW · 1.1 mi