Blink Charging · EV charging site
Stourton Park and Ride Rapid 4
Belle island, Leeds, LS10 3DD
Stourton Park and Ride Rapid 4 is an EV charging site in Leeds, City and Borough of Leeds, run by Blink Charging. Its 3 sockets reach up to 50 kW, with Type 2 and CHAdeMO at the top speed. 4 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Stourton Park and Ride (EB Charging), 90 yards away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Blink Charging
- Opening hours
- Not published
- Access
- Public
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Stourton Park and Ride Rapid 4 (Blink Charging)?
Up to 50 kW DC via Type 2, CHAdeMO.
How many charging sockets does Stourton Park and Ride Rapid 4 (Blink Charging) have?
3 charging sockets: 1 × 50 kW Type 2, 1 × 50 kW CHAdeMO, 1 × 22 kW Type 2.
Who operates Stourton Park and Ride Rapid 4?
Stourton Park and Ride Rapid 4 is on the Blink Charging network.
Where is the nearest other charger with 50 kW or more to Stourton Park and Ride Rapid 4 (Blink Charging)?
Stourton Park and Ride (EB Charging) is 90 yards away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Stourton Park and Ride Rapid 4 (Blink Charging)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Stourton Park and Ride Rapid 4 (Blink Charging)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Stourton Park and Ride Rapid 4 (Blink Charging)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Stourton Park and Ride
- Stourton Park and Ride Fast 5
- Starbucks Queen Street, Leeds
- Stourton Service Station
- Pod Point Aldi Retail Park - Leeds
- Sika LEEDS02
- Cheapest nearby
- Pod Point Aldi Retail Park - Leeds · 25.2p per kWh · 7 kW · 1.2 mi
- Fastest nearby
- Starbucks Queen Street, Leeds · 200 kW · 0.4 mi