EB Charging · EV charging site
Stourton Park and Ride
Unit 1 Stourton Park and Ride, Leeds, LS10 1FF
Stourton Park and Ride is an EV charging site in Leeds, City and Borough of Leeds, run by EB Charging. It has a single socket, with CCS and CHAdeMO at up to 50 kW. 4 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Stourton Park and Ride Rapid 4 (Blink Charging), 90 yards away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- EB Charging
- Opening hours
- Not published
- Access
- Public
- Phone (from Open Charge Map)
- +44 1727 807 263
- Getting there
- Park & Ride Close at 9pm
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Stourton Park and Ride (EB Charging)?
Up to 50 kW DC via CCS, CHAdeMO, Type 2.
How many charging sockets does Stourton Park and Ride (EB Charging) have?
1 charging socket: 4 × 50 kW CCS, 4 × 50 kW CHAdeMO, 4 × 22 kW Type 2, 24 × Type 2.
Who operates Stourton Park and Ride?
Stourton Park and Ride is on the EB Charging network. For site issues, the operator lists +44 1727 807 263.
Where is the nearest other charger with 50 kW or more to Stourton Park and Ride (EB Charging)?
Stourton Park and Ride Rapid 4 (Blink Charging) is 90 yards away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Stourton Park and Ride (EB Charging)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Stourton Park and Ride (EB Charging)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Stourton Park and Ride (EB Charging)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Stourton Park and Ride Fast 5
- Stourton Park and Ride Rapid 4
- Starbucks Queen Street, Leeds
- Stourton Service Station
- Sika LEEDS02
- Pod Point Aldi Retail Park - Leeds
- Cheapest nearby
- Pod Point Aldi Retail Park - Leeds · 25.2p per kWh · 7 kW · 1.2 mi
- Fastest nearby
- Starbucks Queen Street, Leeds · 200 kW · 0.3 mi