BP Pulse · EV charging site
2 Central Parade
Croydon, Hayes, CR0 0JB
2 Central Parade is an EV charging site in Hayes, Greater London, run by BP Pulse and open 24 hours a day. Both of its sockets are 50 kW CHAdeMO and CCS. Recorded live status shows it is usually busiest around 7 pm, and Amp Map measured 98% uptime and recorded 300 charging sessions here over the last 30 days. 3 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Lidl-New Addington, 0.3 miles away.
Status
All 2 in use
Checking status…
Connectors
CCS · 50 kW
CHAdeMO · 50 kW
Reliability is the share of time each socket was not out of order, over the last 30 days.
Site information
- Operator
- BP Pulse
- Opening hours
- Open 24 hours
- Payment
- Bank card at the chargerIn the BP Pulse appRFID card
- Charger ID
- BPT522
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at 2 Central Parade (BP Pulse)?
Up to 50 kW DC via CHAdeMO, CCS.
How many charging sockets does 2 Central Parade (BP Pulse) have?
2 charging sockets: 1 × 50 kW CHAdeMO, 1 × 50 kW CCS. Live per-socket availability is shown on this page.
Is 2 Central Parade (BP Pulse) open 24/7?
Yes - 2 Central Parade (BP Pulse) is open 24 hours a day, 7 days a week.
When is 2 Central Parade (BP Pulse) busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 7 pm and quietest around 6 am. The live status on this page shows what is free before you set off.
How reliable is 2 Central Parade (BP Pulse)?
Amp Map measured 98% uptime here from recorded live status over the last 30 days, across 300 observed charging sessions.
Who operates 2 Central Parade?
2 Central Parade is on the BP Pulse network.
Where is the nearest other charger with 50 kW or more to 2 Central Parade (BP Pulse)?
Lidl-New Addington is 0.3 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at 2 Central Parade (BP Pulse)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at 2 Central Parade (BP Pulse)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at 2 Central Parade (BP Pulse)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Lidl-New Addington
- Opp Horsley Drive
- Frimley Close
- Addington SF Connect
- Bramble Close
- 37 Croydon Road (A232 Eastbound), West Wickham
- Fastest nearby
- Addington SF Connect · 150 kW · 1.2 mi