Lidl · EV charging site
Lidl-New Addington
Parkway, Hayes, CR0 0LA
Lidl-New Addington is an EV charging site in Hayes, Greater London, run by Lidl. Its 2 sockets reach up to 50 kW, with CHAdeMO and CCS at the top speed. 4 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is 2 Central Parade (BP Pulse), 0.3 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Lidl
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.63/kWh; other tariffs available(from Open Charge Map, 25 Jul 2024)
- Notes
- available via Octopus Electroverse and Lidl Plus App
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Lidl-New Addington?
The listed price is £0.63/kWh; other tariffs available. Prices can change, so check the price at the charger before you start.
How fast is charging at Lidl-New Addington?
Up to 50 kW DC via Type 2, CHAdeMO, CCS.
How many charging sockets does Lidl-New Addington have?
2 charging sockets: 1 × 22 kW Type 2, 1 × 50 kW CHAdeMO, 1 × 50 kW CCS.
Who operates Lidl-New Addington?
Lidl-New Addington is on the Lidl network.
Where is the nearest other charger with 50 kW or more to Lidl-New Addington?
2 Central Parade (BP Pulse) is 0.3 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Lidl-New Addington?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Lidl-New Addington?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Lidl-New Addington?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Opp Horsley Drive
- 2 Central Parade
- Frimley Close
- Addington SF Connect
- Bramble Close
- 37 Croydon Road (A232 Eastbound), West Wickham
- Fastest nearby
- Addington SF Connect · 150 kW · 0.9 mi