Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

BP Pulse · EV charging site

Derby Pride Park & Ride Car Park

Derby Pride Park & Ride Car Park, DE24 8BW

Derby Pride Park & Ride Car Park is an EV charging site in Derby, run by BP Pulse. Its 13 sockets reach up to 50 kW, with CCS at the top speed, and published prices run from £0.65 to £0.89 per kWh. Recorded live status shows it is usually busiest around 8 am, and Amp Map measured 0% uptime here over the last 30 days. 12 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is EG GROUP PRIDE PARK (ChargePoint), 0.3 miles away.

Status

Out of service

Checking status…

VerifiedLive status and details from BP Pulse’s data feed. Amp Map updates them automatically.Last synced 22 Nov 2026

Connectors

CCS · 50 kW5 connectors · 89p per kWhOut of service
UC250030% reliabilityOut of order
UC250220% reliabilityOut of order
UC250230% reliabilityOut of order
UC250240% reliabilityOut of order
UC250250% reliabilityOut of order
Type 2 · 7 kW8 connectors · 65p per kWhOut of service
118200% reliabilityOut of order
118200% reliabilityOut of order
118210% reliabilityOut of order
118210% reliabilityOut of order
118220% reliabilityOut of order
118220% reliabilityOut of order
118230% reliabilityOut of order
118230% reliabilityOut of order

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
BP Pulse
Opening hours
Not published
Payment
In the BP Pulse appRFID card
Charger ID
11820

Facilities

Car park

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
CCS50 kW89p per kWh
Type 27 kW65p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 50 kW CCS~70 min · ≈ 55 kWh · ~£49
Tesla Model 3 Rear-Wheel Drive 10–80% · 50 kW CCS~50 min · ≈ 40 kWh · ~£36
Audi Q4 e-tron 50 10–80% · 50 kW CCS~66 min · ≈ 51 kWh · ~£45
Hyundai IONIQ 5 10–80% · 50 kW CCS~64 min · ≈ 51 kWh · ~£45
MG Motor MG4 Trophy 10–80% · 50 kW CCS~55 min · ≈ 43 kWh · ~£38
Hyundai Kona Electric Long Range 10–80% · 50 kW CCS~55 min · ≈ 41 kWh · ~£36
Nissan LEAF 10–80% · 7 kW Type 2~4h 15m · ≈ 28 kWh · ~£18

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Derby Pride Park & Ride Car Park (BP Pulse)?

The listed price is Type 2 £0.65/kWh · CCS £0.89/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Derby Pride Park & Ride Car Park (BP Pulse)?

Up to 50 kW DC via Type 2, CCS.

How many charging sockets does Derby Pride Park & Ride Car Park (BP Pulse) have?

13 charging sockets: 8 × 7 kW Type 2, 5 × 50 kW CCS. Live per-socket availability is shown on this page.

When is Derby Pride Park & Ride Car Park (BP Pulse) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 8 am and quietest around 6 am. The live status on this page shows what is free before you set off.

How reliable is Derby Pride Park & Ride Car Park (BP Pulse)?

Amp Map measured 0% uptime here from recorded live status over the last 30 days.

Who operates Derby Pride Park & Ride Car Park?

Derby Pride Park & Ride Car Park is on the BP Pulse network.

Where is the nearest other charger with 50 kW or more to Derby Pride Park & Ride Car Park (BP Pulse)?

EG GROUP PRIDE PARK (ChargePoint) is 0.3 miles away in a straight line, with up to 175 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Derby Pride Park & Ride Car Park (BP Pulse)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh (~£49 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Derby Pride Park & Ride Car Park (BP Pulse)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Derby Pride Park & Ride Car Park (BP Pulse)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh (~£45 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: BP Pulse · synced 22 Nov 2026

Amp Map does not take payment. You pay the operator.