Oberoi · EV charging site
Oberoi
20, Derby, DE24 8JY
Oberoi is an EV charging site at 20 in Derby, run by Oberoi and open 24 hours a day. All 3 of its sockets are 22 kW Type 2. Recorded live status shows it is usually busiest around noon, and Amp Map measured 100% uptime and recorded 10 charging sessions here over the last 30 days. Amp Map lists 2 other charge points named Oberoi in Derby. 15 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Merlin (Derby) (evyve), 140 yards away.
Status
3 of 3 available
Checking status…
Connectors
Type 2 · 22 kW
Reliability is the share of time each socket was not out of order, over the last 30 days.
Site information
- Operator
- Oberoi
- Opening hours
- Open 24 hours
- Payment
- In the operator's appRFID card
- Charger ID
- 1 (No.19)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Oberoi?
Up to 22 kW AC via Type 2.
How many charging sockets does Oberoi have?
3 charging sockets: 3 × 22 kW Type 2. Live per-socket availability is shown on this page.
Is Oberoi open 24/7?
Yes - Oberoi is open 24 hours a day, 7 days a week.
When is Oberoi busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around noon and quietest around 6 am. The live status on this page shows what is free before you set off.
How reliable is Oberoi?
Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 10 observed charging sessions.
Who operates Oberoi?
Oberoi is on the Oberoi network.
Where is the nearest charger with 50 kW or more to Oberoi?
Merlin (Derby) (evyve) is 140 yards away in a straight line, with up to 300 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Oberoi?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Oberoi?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Oberoi?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Oberoi
- Oberoi
- Merlin (Derby)
- EG Group Pride Park
- Pride Park Park-&-ride, Derby
- Derby Pride Park & Ride Car Park
- Cheapest nearby
- Derby Pride Park & Ride Car Park · 65p per kWh · 50 kW · 0.3 mi
- Fastest nearby
- Merlin (Derby) · 300 kW · 140 yd