Charge Your Car · EV charging site
Pride Park Park-&-ride, Derby
Pride Park Park, Derby, DE24 8BW
Pride Park Park-&-ride, Derby is an EV charging site in Derby, run by Charge Your Car. All 8 of its sockets are 7 kW Type 2. 14 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Derby Pride Park & Ride Car Park (BP Pulse), 130 yards away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Charge Your Car
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.20/kWh;min £1.00(from Open Charge Map, 11 Sept 2019)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Pride Park Park-&-ride, Derby (Charge Your Car)?
The listed price is £0.20/kWh;min £1.00. Prices can change, so check the price at the charger before you start.
How fast is charging at Pride Park Park-&-ride, Derby (Charge Your Car)?
Up to 7 kW AC via Type 2.
How many charging sockets does Pride Park Park-&-ride, Derby (Charge Your Car) have?
8 charging sockets: 8 × 7 kW Type 2.
Who operates Pride Park Park-&-ride, Derby?
Pride Park Park-&-ride, Derby is on the Charge Your Car network.
Where is the nearest charger with 50 kW or more to Pride Park Park-&-ride, Derby (Charge Your Car)?
Derby Pride Park & Ride Car Park (BP Pulse) is 130 yards away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Pride Park Park-&-ride, Derby (Charge Your Car)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Pride Park Park-&-ride, Derby (Charge Your Car)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Pride Park Park-&-ride, Derby (Charge Your Car)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Cheapest nearby
- Derby Pride Park & Ride Car Park · 65p per kWh · 50 kW · 130 yd
- Fastest nearby
- Merlin (Derby) · 300 kW · 0.3 mi