Char.gy · EV charging site
Mini Monsterz
Mini Monsterz, Sleights, YO21 1RL
Mini Monsterz is an EV charging site in Sleights, North Yorkshire, run by Char.gy. It has a single socket, with Type 2 at up to 7 kW. 1 other charging site is listed within a mile, and no site with 50 kW or more is listed within 15 miles.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Char.gy
- Opening hours
- Not published
- Access
- Public
- Price
- Day (07:00-00:00): £0.65/kWh Night (00:00-0700): £0.29/kWh(from Open Charge Map, 22 Jul 2023)
- Phone (from Open Charge Map)
- 0800 086 9606
- Notes
- Can also be paid with the Octopus Electroverse app, Zap-Pay, Bonnet app, Paua App, or Shell Recharge app. Charge point not fitted with RFID reader or payment terminal.
- Getting there
- Pay By Phone 4888
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Mini Monsterz (Char.gy)?
The listed price is Day (07:00-00:00): £0.65/kWh Night (00:00-0700): £0.29/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Mini Monsterz (Char.gy)?
Up to 7 kW AC via Type 2.
How many charging sockets does Mini Monsterz (Char.gy) have?
1 charging socket: 1 × 7 kW Type 2, 1 × 7 kW Type 2.
Who operates Mini Monsterz?
Mini Monsterz is on the Char.gy network. For site issues, the operator lists 0800 086 9606.
Where is the nearest charger with 50 kW or more to Mini Monsterz (Char.gy)?
Amp Map lists no other site with 50 kW or more within 15 miles in a straight line.
How long does a Tesla Model Y Long Range take to charge at Mini Monsterz (Char.gy)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Mini Monsterz (Char.gy)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Mini Monsterz (Char.gy)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Pod Point The Stables
- Marina Back Car Park
- St Hilda's Business Centre
- Pod Point Aldi - Whitby
- West Cliff Car Park
- Church Street Carpark
- Cheapest nearby
- Pod Point Aldi - Whitby · 25.2p per kWh · 7 kW · 1.5 mi
- Fastest nearby
- St Hilda's Business Centre · 22 kW · 1.4 mi