58 Church St, Whitby, YO22 4AS

Church Street Carpark is an EV charging site in Whitby, North Yorkshire, run by Connected Kerb. It has a single socket, with Type 2 at up to 7 kW, and the price is listed as 50p per kW. 3 other charging sites are listed within a mile, and no site with 50 kW or more is listed within 15 miles.

Status

No live status

We don't have live status for this charger. Check it when you arrive.

Community dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 12 Nov 2023Last verified 12 Nov 2023

Connectors

Type 2 · 7 kW4 connectors

Site information

Opening hours
Not published
Access
Public
Price
50p per kW(from Open Charge Map, 12 Nov 2023)
Notes
Parking Fees Apply
Getting there
50p per kW Via App Octopus Rfid card same price

Facilities

Car park

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 7 kW Type 2~7h 54m
Tesla Model 3 Rear-Wheel Drive 10–80% · 7 kW Type 2~5h 42m
Audi Q4 e-tron 50 10–80% · 7 kW Type 2~7h 18m
Hyundai IONIQ 5 10–80% · 7 kW Type 2~7h 16m
MG Motor MG4 Trophy 10–80% · 7 kW Type 2~6h 6m
Hyundai Kona Electric Long Range 10–80% · 7 kW Type 2~5h 48m
Nissan LEAF 10–80% · 7 kW Type 2~4h 15m

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Church Street Carpark (Connected Kerb)?

The listed price is 50p per kW. Prices can change, so check the price at the charger before you start.

How fast is charging at Church Street Carpark (Connected Kerb)?

Up to 7 kW AC via Type 2.

How many charging sockets does Church Street Carpark (Connected Kerb) have?

1 charging socket: 2 × 7 kW Type 2, 2 × 7 kW Type 2.

Who operates Church Street Carpark?

Church Street Carpark is on the Connected Kerb network.

Where is the nearest charger with 50 kW or more to Church Street Carpark (Connected Kerb)?

Amp Map lists no other site with 50 kW or more within 15 miles in a straight line.

How long does a Tesla Model Y Long Range take to charge at Church Street Carpark (Connected Kerb)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Church Street Carpark (Connected Kerb)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Church Street Carpark (Connected Kerb)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.