Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

MER · EV charging site

St Hilda's Business Centre

The Ropery, Whitby, YO22 4ET

St Hilda's Business Centre is an EV charging site in Whitby, North Yorkshire, run by MER. It has a single socket, with Type 2 at up to 22 kW, and the price is listed as £0.42/kW. 4 other charging sites are listed within a mile, and no site with 50 kW or more is listed within 15 miles.

Status

No live status

We don't have live status for this charger. Check it when you arrive.

Community dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 26 Feb 2023Last verified 26 Feb 2023

Connectors

Type 2 · 22 kW4 connectors

Site information

Operator
MER
Opening hours
Not published
Access
Public
Price
£0.42/kW(from Open Charge Map, 26 Feb 2023)

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 22 kW Type 2~5h 2m
Tesla Model 3 Rear-Wheel Drive 10–80% · 22 kW Type 2~3h 38m
Audi Q4 e-tron 50 10–80% · 22 kW Type 2~4h 39m
Hyundai IONIQ 5 10–80% · 22 kW Type 2~4h 37m
MG Motor MG4 Trophy 10–80% · 22 kW Type 2~3h 53m
Hyundai Kona Electric Long Range 10–80% · 22 kW Type 2~5h 38m
Nissan LEAF 10–80% · 22 kW Type 2~4h 15m

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at St Hilda's Business Centre (MER)?

The listed price is £0.42/kW. Prices can change, so check the price at the charger before you start.

How fast is charging at St Hilda's Business Centre (MER)?

Up to 22 kW AC via Type 2.

How many charging sockets does St Hilda's Business Centre (MER) have?

1 charging socket: 2 × 22 kW Type 2, 2 × 22 kW Type 2.

Who operates St Hilda's Business Centre?

St Hilda's Business Centre is on the MER network.

Where is the nearest charger with 50 kW or more to St Hilda's Business Centre (MER)?

Amp Map lists no other site with 50 kW or more within 15 miles in a straight line.

How long does a Tesla Model Y Long Range take to charge at St Hilda's Business Centre (MER)?

A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at St Hilda's Business Centre (MER)?

A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at St Hilda's Business Centre (MER)?

A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 26 Feb 2023

Amp Map does not take payment. You pay the operator.