Chargeplace Scotland · EV charging site
Albert Street, Motherwell
Albert Street, Motherwell, ML1 1PR
Albert Street, Motherwell is an EV charging site in Motherwell, North Lanarkshire, run by Chargeplace Scotland. It has a single socket, with Type 2 at up to 7 kW, and charging is listed as free. 6 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Tim Hortons (E.ON Drive), 0.7 miles away.
Status
Out of service
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Chargeplace Scotland
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- Free(from Open Charge Map, 9 Apr 2018)
- Phone (from Open Charge Map)
- 0141 648 0750
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Albert Street, Motherwell (Chargeplace Scotland)?
The listed price is Free. Prices can change, so check the price at the charger before you start.
How fast is charging at Albert Street, Motherwell (Chargeplace Scotland)?
Up to 7 kW AC via Type 2, BS1363 3 Pin 13 Amp.
How many charging sockets does Albert Street, Motherwell (Chargeplace Scotland) have?
1 charging socket: 1 × 7 kW Type 2, 1 × 3 kW BS1363 3 Pin 13 Amp.
Who operates Albert Street, Motherwell?
Albert Street, Motherwell is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.
Where is the nearest charger with 50 kW or more to Albert Street, Motherwell (Chargeplace Scotland)?
Tim Hortons (E.ON Drive) is 0.7 miles away in a straight line, with up to 200 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Albert Street, Motherwell (Chargeplace Scotland)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Albert Street, Motherwell (Chargeplace Scotland)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Albert Street, Motherwell (Chargeplace Scotland)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Elm Street
- Tim Hortons
- Raven's Cliff, Wishaw
- Motherwell College
- Ravernscraig Sports Centre
- Ravenscraig Sports Centre
- Cheapest nearby
- Raven's Cliff, Wishaw · 89p per kWh · 150 kW · 0.8 mi
- Fastest nearby
- Tim Hortons · 200 kW · 0.7 mi