Chargeplace Scotland · EV charging site
Ravernscraig Sports Centre
New Craig Road., Motherwell, ML1 2TZ
Ravernscraig Sports Centre is an EV charging site in Motherwell, North Lanarkshire, run by Chargeplace Scotland. Both of its sockets are 22 kW Type 2. 7 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Raven's Cliff, Wishaw (Osprey Charging), 0.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Chargeplace Scotland
- Opening hours
- Not published
- Access
- Public
- Phone (from Open Charge Map)
- 0141 648 0750
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Ravernscraig Sports Centre (Chargeplace Scotland)?
Up to 22 kW AC via Type 2.
How many charging sockets does Ravernscraig Sports Centre (Chargeplace Scotland) have?
2 charging sockets: 1 × 22 kW Type 2, 1 × 22 kW Type 2.
Who operates Ravernscraig Sports Centre?
Ravernscraig Sports Centre is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.
Where is the nearest charger with 50 kW or more to Ravernscraig Sports Centre (Chargeplace Scotland)?
Raven's Cliff, Wishaw (Osprey Charging) is 0.2 miles away in a straight line, with up to 150 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Ravernscraig Sports Centre (Chargeplace Scotland)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Ravernscraig Sports Centre (Chargeplace Scotland)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Ravernscraig Sports Centre (Chargeplace Scotland)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Ravenscraig Sports Centre
- Raven's Cliff, Wishaw
- Motherwell College
- In-Site Property Solutions
- Albert Street, Motherwell
- Tim Hortons
- Cheapest nearby
- Raven's Cliff, Wishaw · 89p per kWh · 150 kW · 0.2 mi
- Fastest nearby
- Tim Hortons · 200 kW · 0.9 mi