Osprey Charging · EV charging site
Raven's Cliff, Wishaw
Prospect Hill Road, Motherwell, ML1 2UE
Raven's Cliff, Wishaw is an EV charging site in Motherwell, North Lanarkshire, run by Osprey Charging and open 24 hours a day. All 4 of its sockets are 150 kW CCS, and the published price is £0.89 per kWh. Recorded live status shows it is usually busiest around 3 pm, and Amp Map measured 100% uptime and recorded 281 charging sessions here over the last 30 days. 6 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Tim Hortons (E.ON Drive), 1 mile away.
Status
3 of 4 available
Checking status…
Connectors
CCS · 150 kW
Reliability is the share of time each socket was not out of order, over the last 30 days.
Site information
- Operator
- Osprey Charging
- Opening hours
- Open 24 hours
- Parking
- Car park
- Payment
- Bank card at the chargerIn the Osprey appRFID card
- Charger ID
- 1
- Getting there
- No Parking Restrictions No Height Restriction No Customer Input Required
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Prices
| Connector | Power | Price |
|---|---|---|
| CCS | 150 kW | 89p per kWh |
Price at the charger, including VAT. Paying in the operator's app may cost less.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Raven's Cliff, Wishaw (Osprey Charging)?
The listed price is £0.89/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Raven's Cliff, Wishaw (Osprey Charging)?
Up to 150 kW DC via CCS.
How many charging sockets does Raven's Cliff, Wishaw (Osprey Charging) have?
4 charging sockets: 4 × 150 kW CCS. Live per-socket availability is shown on this page.
Is Raven's Cliff, Wishaw (Osprey Charging) open 24/7?
Yes - Raven's Cliff, Wishaw (Osprey Charging) is open 24 hours a day, 7 days a week.
When is Raven's Cliff, Wishaw (Osprey Charging) busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 3 pm and quietest around 6 am. The live status on this page shows what is free before you set off.
How reliable is Raven's Cliff, Wishaw (Osprey Charging)?
Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 281 observed charging sessions.
Who operates Raven's Cliff, Wishaw?
Raven's Cliff, Wishaw is on the Osprey Charging network.
Where is the nearest other charger with 50 kW or more to Raven's Cliff, Wishaw (Osprey Charging)?
Tim Hortons (E.ON Drive) is 1 mile away in a straight line, with up to 200 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Raven's Cliff, Wishaw (Osprey Charging)?
A typical 10–80% rapid charge takes about 27 min on the 150 kW CCS here, adding roughly 55 kWh (~£49 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Raven's Cliff, Wishaw (Osprey Charging)?
A typical 10–80% rapid charge takes about 24 min on the 150 kW CCS here, adding roughly 40 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Raven's Cliff, Wishaw (Osprey Charging)?
A typical 10–80% rapid charge takes about 39 min on the 150 kW CCS here, adding roughly 51 kWh (~£45 at the published price). Estimates assume a typical charge curve and a warm battery.