Chargeplace Scotland · EV charging site
In-Site Property Solutions
Flemmington Industrial Park, Motherwell, ML1 2NT
In-Site Property Solutions is an EV charging site in Motherwell, North Lanarkshire, run by Chargeplace Scotland. Both of its sockets are 7 kW Type 2, and charging is listed as free. 7 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Tim Hortons (E.ON Drive), 0.6 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Chargeplace Scotland
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- Free(from Open Charge Map, 26 Jul 2018)
- Phone (from Open Charge Map)
- 0141 648 0750
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at In-Site Property Solutions (Chargeplace Scotland)?
The listed price is Free. Prices can change, so check the price at the charger before you start.
How fast is charging at In-Site Property Solutions (Chargeplace Scotland)?
Up to 7 kW AC via Type 2.
How many charging sockets does In-Site Property Solutions (Chargeplace Scotland) have?
2 charging sockets: 2 × 7 kW Type 2.
Who operates In-Site Property Solutions?
In-Site Property Solutions is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.
Where is the nearest charger with 50 kW or more to In-Site Property Solutions (Chargeplace Scotland)?
Tim Hortons (E.ON Drive) is 0.6 miles away in a straight line, with up to 200 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at In-Site Property Solutions (Chargeplace Scotland)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at In-Site Property Solutions (Chargeplace Scotland)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at In-Site Property Solutions (Chargeplace Scotland)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Motherwell College
- Tim Hortons
- Ravenscraig Sports Centre
- Ravernscraig Sports Centre
- Burger King, Wishaw
- Raven's Cliff, Wishaw
- Cheapest nearby
- Burger King, Wishaw · 89p per kWh · 75 kW · 0.7 mi
- Fastest nearby
- Tim Hortons · 200 kW · 0.6 mi