Chargeplace Scotland · EV charging site
Blairhill Park & Ride
Corsewall Street, Coatbridge, ML5 1NP
Blairhill Park & Ride is an EV charging site in Coatbridge, North Lanarkshire, run by Chargeplace Scotland. Both of its sockets are 22 kW Type 2, and charging is listed as free. 3 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Bank Street (BP Pulse), 0.6 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Chargeplace Scotland
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- Free(from Open Charge Map, 13 May 2020)
- Phone (from Open Charge Map)
- 0141 648 0750
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Blairhill Park & Ride (Chargeplace Scotland)?
The listed price is Free. Prices can change, so check the price at the charger before you start.
How fast is charging at Blairhill Park & Ride (Chargeplace Scotland)?
Up to 22 kW AC via Type 2.
How many charging sockets does Blairhill Park & Ride (Chargeplace Scotland) have?
2 charging sockets: 2 × 22 kW Type 2.
Who operates Blairhill Park & Ride?
Blairhill Park & Ride is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.
Where is the nearest charger with 50 kW or more to Blairhill Park & Ride (Chargeplace Scotland)?
Bank Street (BP Pulse) is 0.6 miles away in a straight line, with up to 150 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Blairhill Park & Ride (Chargeplace Scotland)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Blairhill Park & Ride (Chargeplace Scotland)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Blairhill Park & Ride (Chargeplace Scotland)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Bank Street
- Coatbridge Service Station
- Muiryhall St Car Park, Coatbridge
- Waste Management Depot, Souterhouse Road
- Starbucks Coatbridge - 0027
- The Atrium Business Centre
- Cheapest nearby
- Starbucks Coatbridge - 0027 · 75p per kWh · 160 kW · 1.1 mi
- Fastest nearby
- Starbucks Coatbridge - 0027 · 160 kW · 1.1 mi