Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

The Atrium Business Centre · EV charging site

The Atrium Business Centre

North Caldeen Road, Coatbridge, ML5 4EF

The Atrium Business Centre is an EV charging site in Coatbridge, North Lanarkshire, run by The Atrium Business Centre and open 24 hours a day. Both of its sockets are 7 kW Type 2. 3 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Starbucks Coatbridge - 0027 (FOR EV), 0.3 miles away.

Status

Not reporting

Checking status…

VerifiedLive status and details from The Atrium Business Centre’s data feed. Amp Map updates them automatically.Last synced 22 Nov 2026

Connectors

Type 2 · 7 kW2 connectorsStatus unknown
Left SocketStatus unknown
Right SocketStatus unknown

Site information

Opening hours
Open 24 hours
Payment
In the operator's appRFID card
Charger ID
Left Socket

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 7 kW Type 2~7h 54m
Tesla Model 3 Rear-Wheel Drive 10–80% · 7 kW Type 2~5h 42m
Audi Q4 e-tron 50 10–80% · 7 kW Type 2~7h 18m
Hyundai IONIQ 5 10–80% · 7 kW Type 2~7h 16m
MG Motor MG4 Trophy 10–80% · 7 kW Type 2~6h 6m
Hyundai Kona Electric Long Range 10–80% · 7 kW Type 2~5h 48m
Nissan LEAF 10–80% · 7 kW Type 2~4h 15m

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How fast is charging at The Atrium Business Centre?

Up to 7 kW AC via Type 2.

How many charging sockets does The Atrium Business Centre have?

2 charging sockets: 2 × 7 kW Type 2. Live per-socket availability is shown on this page.

Is The Atrium Business Centre open 24/7?

Yes - The Atrium Business Centre is open 24 hours a day, 7 days a week.

Who operates The Atrium Business Centre?

The Atrium Business Centre is on the The Atrium Business Centre network.

Where is the nearest charger with 50 kW or more to The Atrium Business Centre?

Starbucks Coatbridge - 0027 (FOR EV) is 0.3 miles away in a straight line, with up to 160 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at The Atrium Business Centre?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at The Atrium Business Centre?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at The Atrium Business Centre?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: The Atrium Business Centre · synced 22 Nov 2026

Amp Map does not take payment. You pay the operator.