Scottish Power · EV charging site
Storage Vault Coatbridge Carpark
240 Whifflet street, Coatbridge, ML5 4RX
Storage Vault Coatbridge Carpark is an EV charging site in Coatbridge, North Lanarkshire, run by Scottish Power. Its 3 sockets reach up to 50 kW, with Type 2 and CHAdeMO at the top speed. 2 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Starbucks Coatbridge - 0027 (FOR EV), 0.9 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Scottish Power
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Storage Vault Coatbridge Carpark (Scottish Power)?
Up to 50 kW DC via Type 2, CHAdeMO.
How many charging sockets does Storage Vault Coatbridge Carpark (Scottish Power) have?
3 charging sockets: 1 × 50 kW Type 2, 1 × 50 kW CHAdeMO, 1 × 22 kW Type 2.
Who operates Storage Vault Coatbridge Carpark?
Storage Vault Coatbridge Carpark is on the Scottish Power network.
Where is the nearest other charger with 50 kW or more to Storage Vault Coatbridge Carpark (Scottish Power)?
Starbucks Coatbridge - 0027 (FOR EV) is 0.9 miles away in a straight line, with up to 160 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Storage Vault Coatbridge Carpark (Scottish Power)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Storage Vault Coatbridge Carpark (Scottish Power)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Storage Vault Coatbridge Carpark (Scottish Power)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Waste Management Depot, Souterhouse Road
- The Atrium Business Centre
- Starbucks Coatbridge - 0027
- IONITY GmbH IONITY Strathclyde
- Coatbridge Service Station
- Muiryhall St Car Park, Coatbridge
- Cheapest nearby
- Starbucks Coatbridge - 0027 · 75p per kWh · 160 kW · 0.9 mi
- Fastest nearby
- IONITY GmbH IONITY Strathclyde · 200 kW · 1.1 mi