Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

FOR EV · EV charging site

Starbucks Coatbridge - 0027

Starbucks Coatbridge, Coatbank Way, ML5 3SP

Starbucks Coatbridge - 0027 is an EV charging site in Coatbridge, North Lanarkshire, run by FOR EV and open 24 hours a day. All 4 of its sockets are 160 kW CCS, and the published price is £0.75 per kWh. Recorded live status shows it is usually busiest around 11 am, and Amp Map measured 100% uptime and recorded 378 charging sessions here over the last 30 days. 3 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Storage Vault Coatbridge Carpark (Scottish Power), 0.9 miles away.

Status

3 of 4 available

Checking status…

VerifiedLive status and details from FOR EV’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

CCS · 160 kW4 connectors · 75p per kWh3 free1 in use
STARCOAT-1-CCS100% reliabilityAvailable
STARCOAT-2-CCS100% reliabilityAvailable
STARCOAT-3-CCS100% reliabilityAvailable
STARCOAT-4-CCS100% reliabilityCharging

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
FOR EV
Opening hours
Open 24 hours
Parking
Car park
Payment
Contactless card at the chargerIn the FOR EV appRFID card
Charger ID
STARCOAT-1-CCS

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
CCS160 kW75p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 160 kW CCS~26 min · ≈ 55 kWh · ~£41
Tesla Model 3 Rear-Wheel Drive 10–80% · 160 kW CCS~23 min · ≈ 40 kWh · ~£30
Audi Q4 e-tron 50 10–80% · 160 kW CCS~39 min · ≈ 51 kWh · ~£38
Hyundai IONIQ 5 10–80% · 160 kW CCS~22 min · ≈ 51 kWh · ~£38
MG Motor MG4 Trophy 10–80% · 160 kW CCS~30 min · ≈ 43 kWh · ~£32
Hyundai Kona Electric Long Range 10–80% · 160 kW CCS~39 min · ≈ 41 kWh · ~£30

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Starbucks Coatbridge - 0027 (FOR EV)?

The listed price is £0.75/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Starbucks Coatbridge - 0027 (FOR EV)?

Up to 160 kW DC via CCS.

How many charging sockets does Starbucks Coatbridge - 0027 (FOR EV) have?

4 charging sockets: 4 × 160 kW CCS. Live per-socket availability is shown on this page.

Is Starbucks Coatbridge - 0027 (FOR EV) open 24/7?

Yes - Starbucks Coatbridge - 0027 (FOR EV) is open 24 hours a day, 7 days a week.

When is Starbucks Coatbridge - 0027 (FOR EV) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 11 am and quietest around 11 pm. The live status on this page shows what is free before you set off.

How reliable is Starbucks Coatbridge - 0027 (FOR EV)?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 378 observed charging sessions.

Who operates Starbucks Coatbridge - 0027?

Starbucks Coatbridge - 0027 is on the FOR EV network.

Where is the nearest other charger with 50 kW or more to Starbucks Coatbridge - 0027 (FOR EV)?

Storage Vault Coatbridge Carpark (Scottish Power) is 0.9 miles away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Starbucks Coatbridge - 0027 (FOR EV)?

A typical 10–80% rapid charge takes about 26 min on the 160 kW CCS here, adding roughly 55 kWh (~£41 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Starbucks Coatbridge - 0027 (FOR EV)?

A typical 10–80% rapid charge takes about 23 min on the 160 kW CCS here, adding roughly 40 kWh (~£30 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Starbucks Coatbridge - 0027 (FOR EV)?

A typical 10–80% rapid charge takes about 39 min on the 160 kW CCS here, adding roughly 51 kWh (~£38 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: FOR EV · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.