Connected Kerb · EV charging site
Genral Offices ( west car park ) 2, Blaenau Gwent
Genral Offices ( west car park ), Ebbw Vale, NP23 8UW
Genral Offices ( west car park ) 2, Blaenau Gwent is an EV charging site in Ebbw Vale, Blaenau Gwent, run by Connected Kerb. Both of its sockets are 7 kW Type 2. 6 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Morrisons Ebbw Vale (GeniePoint), 1.4 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Connected Kerb
- Opening hours
- Not published
- Access
- Public
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Genral Offices ( west car park ) 2, Blaenau Gwent (Connected Kerb)?
Up to 7 kW AC via Type 2.
How many charging sockets does Genral Offices ( west car park ) 2, Blaenau Gwent (Connected Kerb) have?
2 charging sockets: 1 × 7 kW Type 2, 1 × 7 kW Type 2.
Who operates Genral Offices ( west car park ) 2, Blaenau Gwent?
Genral Offices ( west car park ) 2, Blaenau Gwent is on the Connected Kerb network.
Where is the nearest charger with 50 kW or more to Genral Offices ( west car park ) 2, Blaenau Gwent (Connected Kerb)?
Morrisons Ebbw Vale (GeniePoint) is 1.4 miles away in a straight line, with up to 60 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Genral Offices ( west car park ) 2, Blaenau Gwent (Connected Kerb)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Genral Offices ( west car park ) 2, Blaenau Gwent (Connected Kerb)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Genral Offices ( west car park ) 2, Blaenau Gwent (Connected Kerb)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Boxworks, Ebbw Vale
- The Works Multistorey Ground Floor
- Lime Avenue, Ebbw Vale
- Colliers' Row
- Ebbw Fawr Primary School, Ebbw Vale
- Pod Point Tesco Superstore - Ebbw Vale
- Cheapest nearby
- Pod Point Tesco Superstore - Ebbw Vale · 49.2p per kWh · 22 kW · 0.8 mi
- Fastest nearby
- Boxworks, Ebbw Vale · 22 kW · 0.1 mi