Silverstone Green Energy · EV charging site
The Works Multistorey Ground Floor
Lime Avenue, Ebbw Vale, NP23 6GL
The Works Multistorey Ground Floor is an EV charging site in Ebbw Vale, Blaenau Gwent, run by Silverstone Green Energy. Both of its sockets are 22 kW Type 2. 6 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Morrisons Ebbw Vale (GeniePoint), 1.4 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Silverstone Green Energy
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at The Works Multistorey Ground Floor (Silverstone Green Energy)?
Up to 22 kW AC via Type 2.
How many charging sockets does The Works Multistorey Ground Floor (Silverstone Green Energy) have?
2 charging sockets: 1 × 22 kW Type 2, 1 × 22 kW Type 2.
Who operates The Works Multistorey Ground Floor?
The Works Multistorey Ground Floor is on the Silverstone Green Energy network.
Where is the nearest charger with 50 kW or more to The Works Multistorey Ground Floor (Silverstone Green Energy)?
Morrisons Ebbw Vale (GeniePoint) is 1.4 miles away in a straight line, with up to 60 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at The Works Multistorey Ground Floor (Silverstone Green Energy)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at The Works Multistorey Ground Floor (Silverstone Green Energy)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at The Works Multistorey Ground Floor (Silverstone Green Energy)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Genral Offices ( west car park ) 2, Blaenau Gwent
- Boxworks, Ebbw Vale
- Lime Avenue, Ebbw Vale
- Colliers' Row
- Ebbw Fawr Primary School, Ebbw Vale
- Pod Point Tesco Superstore - Ebbw Vale
- Cheapest nearby
- Pod Point Tesco Superstore - Ebbw Vale · 49.2p per kWh · 22 kW · 0.9 mi