ESB Ecars · EV charging site
Fairhill Shopping Centre
Parkway, Ballymena, BT43 6UF
Fairhill Shopping Centre is an EV charging site in Ballymena, Mid and East Antrim, run by ESB Ecars. Both of its sockets are 22 kW Type 2. 8 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Maxol Braid River, 0.4 miles away.
Status
Out of service
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- ESB Ecars
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Phone (from Open Charge Map)
- 1890 372 387
- Getting there
- Fairhill Shopping Centre, Fairhill Ln, Ballymena, Antrim
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Fairhill Shopping Centre (ESB Ecars)?
Up to 22 kW AC via Type 2.
How many charging sockets does Fairhill Shopping Centre (ESB Ecars) have?
2 charging sockets: 2 × 22 kW Type 2.
Who operates Fairhill Shopping Centre?
Fairhill Shopping Centre is on the ESB Ecars network. For site issues, the operator lists 1890 372 387.
Where is the nearest charger with 50 kW or more to Fairhill Shopping Centre (ESB Ecars)?
Maxol Braid River is 0.4 miles away in a straight line, with up to 200 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Fairhill Shopping Centre (ESB Ecars)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Fairhill Shopping Centre (ESB Ecars)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Fairhill Shopping Centre (ESB Ecars)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Adair Arms Hotel
- Maxol Braid River
- Dreams
- Ballymena Park and Ride, Galgorm Road
- The Range
- Seven Towers Leisure Centre
- Fastest nearby
- Maxol Braid River · 200 kW · 0.4 mi