Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Weev · EV charging site

Adair Arms Hotel

1-7 Ballymoney Road, Ballymena, BT43 5BS

Adair Arms Hotel is an EV charging site in Ballymena, Mid and East Antrim, run by Weev. All 3 of its sockets are 7 kW Type 2. 9 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Maxol Braid River, 0.1 miles away.

Status

No live status

We don't have live status for this charger. Check it when you arrive.

Community dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 16 Oct 2024Last verified 16 Oct 2024

Connectors

Type 2 · 7 kW3 connectors

Site information

Operator
Weev
Opening hours
Not published
Access
Public · membership required · access key required
Phone (from Open Charge Map)
+44 29 9031 3031

Facilities

Hotel / inn

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 7 kW Type 2~7h 54m
Tesla Model 3 Rear-Wheel Drive 10–80% · 7 kW Type 2~5h 42m
Audi Q4 e-tron 50 10–80% · 7 kW Type 2~7h 18m
Hyundai IONIQ 5 10–80% · 7 kW Type 2~7h 16m
MG Motor MG4 Trophy 10–80% · 7 kW Type 2~6h 6m
Hyundai Kona Electric Long Range 10–80% · 7 kW Type 2~5h 48m
Nissan LEAF 10–80% · 7 kW Type 2~4h 15m

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How fast is charging at Adair Arms Hotel (Weev)?

Up to 7 kW AC via Type 2.

How many charging sockets does Adair Arms Hotel (Weev) have?

3 charging sockets: 3 × 7 kW Type 2.

Who operates Adair Arms Hotel?

Adair Arms Hotel is on the Weev network. For site issues, the operator lists +44 29 9031 3031.

Where is the nearest charger with 50 kW or more to Adair Arms Hotel (Weev)?

Maxol Braid River is 0.1 miles away in a straight line, with up to 200 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Adair Arms Hotel (Weev)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Adair Arms Hotel (Weev)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Adair Arms Hotel (Weev)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 16 Oct 2024

Amp Map does not take payment. You pay the operator.