Maxol · EV charging site
Maxol Braid River
North Road, Ballymena, BT43 5EY
Maxol Braid River is an EV charging site in Ballymena, Mid and East Antrim, run by Maxol. All 4 of its sockets are 200 kW CCS. 9 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Dreams (Weev), 0.3 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Maxol
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Maxol Braid River?
Up to 200 kW DC via CCS.
How many charging sockets does Maxol Braid River have?
4 charging sockets: 4 × 200 kW CCS.
Who operates Maxol Braid River?
Maxol Braid River is on the Maxol network.
Where is the nearest other charger with 50 kW or more to Maxol Braid River?
Dreams (Weev) is 0.3 miles away in a straight line, with up to 120 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Maxol Braid River?
A typical 10–80% rapid charge takes about 23 min on the 200 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Maxol Braid River?
A typical 10–80% rapid charge takes about 23 min on the 200 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Maxol Braid River?
A typical 10–80% rapid charge takes about 39 min on the 200 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.