ESB Energy · EV charging site
302 Godstone Rd, Kenley
302 Godstone Rd Kenley, Kenley, Purley, CR8 5BG
302 Godstone Rd, Kenley is an EV charging site in Purley, Greater London, run by ESB Energy. Its 3 sockets reach up to 50 kW, with CHAdeMO and Type 2 at the top speed. 3 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Godstone Road Station (ESB Energy), 60 yards away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- ESB Energy
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Phone (from Open Charge Map)
- +44 345 609 0372
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at 302 Godstone Rd, Kenley (ESB Energy)?
Up to 50 kW DC via CHAdeMO, Type 2.
How many charging sockets does 302 Godstone Rd, Kenley (ESB Energy) have?
3 charging sockets: 1 × 50 kW CHAdeMO, 1 × 43 kW Type 2, 1 × 50 kW Type 2.
Who operates 302 Godstone Rd, Kenley?
302 Godstone Rd, Kenley is on the ESB Energy network. For site issues, the operator lists +44 345 609 0372.
Where is the nearest other charger with 50 kW or more to 302 Godstone Rd, Kenley (ESB Energy)?
Godstone Road Station (ESB Energy) is 60 yards away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at 302 Godstone Rd, Kenley (ESB Energy)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at 302 Godstone Rd, Kenley (ESB Energy)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at 302 Godstone Rd, Kenley (ESB Energy)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Godstone Road Station
- 72-74 Godstone Road
- 40 Godstone Road
- Lower Road
- Wattenden Arms
- Shell Recharge Shell Little Waitrose Whyteleafe
- Cheapest nearby
- Shell Recharge Shell Little Waitrose Whyteleafe · 89p per kWh · 50 kW · 1.2 mi