Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

EV charging site

72-74 Godstone Road

72-74 Godstone Road, Purley, CR8 5AA

72-74 Godstone Road is an EV charging site in Purley, Greater London. It has a single socket, with CHAdeMO and CCS at up to 50 kW. 4 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is 40 Godstone Road, 0.3 miles away.

Status

No live status

We don't have live status for this charger. Check it when you arrive.

Community dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 12 Oct 2018Last verified 12 Oct 2018

Connectors

CCS · 50 kW1 connector
CHAdeMO · 50 kW1 connector
Type 2 · 43 kW1 connector

Site information

Opening hours
Not published
Access
Public · membership required · access key required
Notes
ESB EV Solutions charger.

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 50 kW CCS~70 min
Tesla Model 3 Rear-Wheel Drive 10–80% · 50 kW CCS~50 min
Audi Q4 e-tron 50 10–80% · 50 kW CCS~66 min
Hyundai IONIQ 5 10–80% · 50 kW CCS~64 min
MG Motor MG4 Trophy 10–80% · 50 kW CCS~55 min
Hyundai Kona Electric Long Range 10–80% · 50 kW CCS~55 min
Nissan LEAF 10–80% · 50 kW CHAdeMO~55 min

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How fast is charging at 72-74 Godstone Road?

Up to 50 kW DC via CHAdeMO, CCS, Type 2.

How many charging sockets does 72-74 Godstone Road have?

1 charging socket: 1 × 50 kW CHAdeMO, 1 × 50 kW CCS, 1 × 43 kW Type 2.

Where is the nearest other charger with 50 kW or more to 72-74 Godstone Road?

40 Godstone Road is 0.3 miles away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at 72-74 Godstone Road?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at 72-74 Godstone Road?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at 72-74 Godstone Road?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 12 Oct 2018

Amp Map does not take payment. You pay the operator.