ESB Energy · EV charging site
Godstone Road Station
302 Godstone Road, Purley, CR8 5BG
Godstone Road Station is an EV charging site in Purley, Greater London, run by ESB Energy. It has a single socket, with CHAdeMO and CCS at up to 50 kW, and the price is listed as £0.25/kWh. 3 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is 302 Godstone Rd, Kenley (ESB Energy), 60 yards away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- ESB Energy
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.25/kWh(from Open Charge Map, 16 Jun 2023)
- Phone (from Open Charge Map)
- +44 345 609 0372
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Godstone Road Station (ESB Energy)?
The listed price is £0.25/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Godstone Road Station (ESB Energy)?
Up to 50 kW DC via CHAdeMO, CCS, Type 2.
How many charging sockets does Godstone Road Station (ESB Energy) have?
1 charging socket: 1 × 50 kW CHAdeMO, 1 × 50 kW CCS, 1 × 43 kW Type 2.
Who operates Godstone Road Station?
Godstone Road Station is on the ESB Energy network. For site issues, the operator lists +44 345 609 0372.
Where is the nearest other charger with 50 kW or more to Godstone Road Station (ESB Energy)?
302 Godstone Rd, Kenley (ESB Energy) is 60 yards away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Godstone Road Station (ESB Energy)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Godstone Road Station (ESB Energy)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Godstone Road Station (ESB Energy)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- 302 Godstone Rd, Kenley
- 72-74 Godstone Road
- 40 Godstone Road
- Wattenden Arms
- Lower Road
- Shell Recharge Shell Little Waitrose Whyteleafe
- Cheapest nearby
- Shell Recharge Shell Little Waitrose Whyteleafe · 89p per kWh · 50 kW · 1.2 mi